Project Description:
Our Team succeeded in gaining a special client, the leading Company in the technology of Vaccine Production and honored with the complete design of their factory.
in accordance with standards and specification of ASHRAE, SMACNA, NFPA, ASME, ASTM & IPS technical requirements and complete confidentiality for Such classified Projects.
Consultant: Eng. Ahmed Abd Elhai
Area Of Work:
- Factory in Menofia City.
Scope Of Work:
Complete Design package of MEP and utilities systems to ensure Optimum operation of the full factory including: HVAC Chilled water, Firefighting, Fire alarm, Power, Compressed air, Purified Water, Drainage, Industrial Steam systems. Complete with the following documents:
- All technical submittals
- data sheets,
- As-built layouts,
- Room data sheets,
- Schematic diagrams
- Pressure layouts
- Hygienic zoning
- AHU zoning
- Electric and control layouts